Moss Vale
Project name: Factory in Moss Vale (steel fixing)
What was required: Concrete panel walls pre-fab on top of the slab - “domino”.
Details: Slab on the ground with mesh only. Once the concrete was done, the farmworker did the panels on top of the slab with a liquid to prevent the panels from sticking to the concrete. Then we did the steel with mesh with extra bars around if required. Followed by the windows and doors and a trimmer bar all around the panel. Then concrete, and another one on top, and once again. Once finished, the crane put all the wall panels up in position with braces. All walls were ready in a couple of days, ready for the roof.